Level Crossing Removal scheme – Slab resurfacing & crack Injection

Victorian Remedial was engaged to remediate cracking in the bridge walkway at Thompsons Rd level crossing upgrade project for BMD. All cracks were injected with a low viscosity epoxy. The affected areas were coated with a cementitious coating for aesthetics and UV protection.

Preparing the cracks (Left) Epoxy filled and sand seeded (Right)

Concrete-Repair-20

Pressure Washing (Left) Application of Primer and First Coat (Right)

Brush Finish to the Second (Left) Coat Finished area (Right)